Arc welding three axis horizontal rotating positioner workstation – car charging pile

1

Coming from 2019 to 2022, with the outbreak, we have to admit that this is a long battle, in the face of the lack of labor force, more and more use of industrial robot factory choice to replace artificial, Jiesheng robots for you to provide turn-key project, starting from the design, including fixture processing equipment, equipment installation, test and initial operation after the smooth functioning of the solution.

2

A company specialized in making charging piles for new energy vehicles found Jiesheng. We learned that the material the customer needs to weld is carbon steel, and we want to weld at multiple stations to improve efficiency. We provided the design scheme of arc welding workstation for the customer, which was approved by the customer. Finally, the customer decided to set 5 sets of arc welding three-axis horizontal rotating positioner workstation, including Yaskawa robot AR2010, welding machine RD350S, external shaft transformation, safety fence, etc. The positioner is designed according to the size of the workpiece, with span of 2400mm and radius of rotation of 730mm. In the middle of November 2021, four engineers of our company completed the installation, debugging, communication and welding test in the customer’s factory. The speed and quality of welders were recognized by the customer.

3

Yaskawa welding robot AR2010 arm span 2010mm, payload 12kg, three axis positioner to achieve edge welding side of the lower part, to provide stable and high quality welding quality, automatic production and operation is simple, the bearing, span, size of the positioner can be customized, welcome to inquire.


Post time: Nov-09-2022

Get the data sheet or free quote

Write your message here and send it to us